Service

Timber flooring installation across Sydney

Engineered oak, solid hardwood, hybrid and vinyl plank — measured, moisture-tested, acclimatised and installed to the manufacturer’s specification.

Timber-look plank flooring laid through a living area

Most flooring failures are not laid on the day the boards go down. They are laid weeks earlier, in a subfloor that was never properly checked, or in a pack of timber that went straight from a cold truck onto a warm slab. We work the other way around: measure, test, record, then install.

Every job is carried out or directly supervised by the owner, working to a set-out agreed before anything is ordered. One point of accountability from the measure through to the handover walk-through.

What a proper installation involves

Every floor is different, but the sequence rarely changes. Skipping any of these is how a floor ends up cupping, gapping or peaking two summers later.

The sequence

  • On-site measure, with the set-out direction agreed before anything is ordered.
  • Subfloor assessment — flatness checked against a straight edge, moisture read with a meter, and any movement or damp identified in writing before we commit to a date.
  • Delivery and acclimatisation. Boards are stacked in the room they will live in, not in the garage, and left until their moisture content sits close to the in-service equilibrium of that building.
  • Preparation — levelling compound, ply overlay or moisture barrier as the substrate requires. Quoted separately, always, because nobody can price this honestly from a photo.
  • Installation to the manufacturer’s system, using the adhesive or underlay that product’s warranty actually requires.
  • Trims, transitions and skirting, then a clean site and a walk-through before we ask for the balance.

Moisture is the whole game

Timber is hygroscopic: it takes on and gives off moisture until it reaches equilibrium with the air around it. At 25°C and 60% relative humidity that equilibrium sits near 11% moisture content. At 25°C and 80% it is closer to 16%. A floor laid at one and living at the other will move, and no fixing method stops it.

Sydney makes this sharper than most cities. A house four hundred metres from the water at Newport behaves differently to one in Frenchs Forest, and a west-facing apartment with full-height glass behaves differently again. So we take readings rather than assume, and we write them down. If the numbers say wait, we wait — that conversation is much cheaper than the one about a cupped floor.

Fixing method, and why it matters to you

Floating over an acoustic underlay is faster, cheaper, reversible, and the sensible default for most apartments. Direct-stick — glued to the substrate — feels and sounds more solid underfoot, is required for most solid timber, and demands a much flatter and drier subfloor. Which one is right depends on the substrate, the product, the acoustic requirement and how the room is used.

We will tell you which one your job needs and why, including when the cheaper option is the better one.

At a glance

Products installedEngineered oak, solid hardwood, hybrid, SPC, laminate, vinyl plank
Fixing methodsFloating over underlay, direct-stick adhesive, secret-nail to joists or ply
SubstratesConcrete slab, particleboard, plywood, existing timber, compressed sheet
Standards referencedATFA installation standards; AS 1684 subfloor framing; AS/NZS 1080.1 moisture testing
Typical lead timeMeasure within days; installation booked once materials have acclimatised

Related work

From this kind of job

Warm timber-look plank laid through an open living area
Warm timber-look plank through an open living areaInstallation · completed
Boards set out against a prepared subfloor during installation
Boards set out against a prepared subfloorSubfloor preparation
Planks being laid over underlay, with the underlay visible between runs
Planks going down over underlay, laid run by runInstallation · in progress
Mitre saw and materials set up in a room being floored
Cutting station set up in a room being flooredInstallation · in progress

Questions

Common questions

How long does timber flooring installation take?

A single room is usually one day. A typical three-bedroom home or apartment runs two to four days for the flooring itself, plus any subfloor preparation beforehand and trims afterwards. Herringbone, chevron and stairs take considerably longer than straight-lay because every board is cut and set individually. We give you a day count in the written quote, not a vague range.

Do I need to move out while the floor is installed?

Almost never for an installation. We work room by room where we can, protect the areas we are not in, and leave the site broom-clean each evening. You will need the rooms we are working in cleared of furniture, and there is noise from cutting. Floor sanding is the exception — that is dustier and noisier, and many people prefer to be out for those days.

How long does timber need to acclimatise before installation?

There is no universal number, and anyone who says "seven days" for every job is guessing. Acclimatisation time depends on how far the boards’ moisture content sits from the in-service equilibrium of your building, and how quickly that species responds. Some products need days, some need a fortnight, and some engineered floors are stable enough to lay almost immediately. We take meter readings rather than work off a rule of thumb.

Can you install over an existing tiled or timber floor?

Often yes. Floating floors can go over sound, flat tiles or existing timber, which saves the cost and mess of removal. It does raise the floor height, so doors may need trimming and transitions need planning at thresholds. If the existing surface is drummy, uneven or damp, it has to come up — we tell you that at the measure, not halfway through the job.

Do you supply the flooring or can I buy my own?

Both. We supply from the trade suppliers we use regularly, which usually lands better value than retail, and it keeps the product warranty and the installation warranty in one place. If you have already bought your own flooring, or your designer has specified something particular, we are happy to install it — we will just check the product’s installation requirements before we start.

Also relevant

Related services

Engineered oak flooring

The most specified floor in Sydney right now, and for good reason — real timber wear layer, far more dimensional stability than solid, and it suits apartments.

Read more

Subfloor preparation

The least visible part of the job and the part that decides whether the floor above it lasts. Always assessed on site, always quoted separately.

Read more

Apartment & strata flooring

Hard flooring in a NSW apartment is an acoustic and approval problem before it is a flooring problem. This is the part almost nobody explains properly.

Read more

Free measure & quote

Get a quote for timber flooring installation

Free on-site measure, itemised written quote, and the exclusions stated plainly.

Hours
Mon–Fri 7am–5pm · Sat 8am–2pm

What do you need?
Where, and how much?

Property type

Roughly how much floor?

When are you thinking?
How should we reach you?

We answer every enquiry within 2 business hours. No obligation, and no payment until you accept a written quote.

Call 0420 990 405 Free quote