Hard flooring in a NSW apartment is an acoustic and approval problem before it is a flooring problem. This is the part almost nobody explains properly.

Engineered oak being installed in an apartment above treetop level

Every year owners across Manly, Dee Why, Neutral Bay, Cremorne, North Sydney and Bondi install a floor, receive a complaint from the lot below, and discover their building had an acoustic requirement they were never told about. NCAT has ordered non-compliant floors removed at the owner’s cost.

It is entirely avoidable. The requirements are published, the approval pathway is set out in legislation, and the paperwork is straightforward once you know what is being asked for. We treat that as part of the job.

The two rules that apply to your floor

First, the National Construction Code. For a floor separating one apartment from another, NCC 2022 Part F7 requires impact sound insulation of L′nT,w ≤ 62 and airborne insulation of Rw + Ctr ≥ 50, determined under AS ISO 717.2. That is the legal floor, not a target.

Second — and this is the one that actually catches people — your building’s own by-law. Most NSW schemes set a stricter requirement than the Code, expressed as an AAAC star rating. The NSW model by-law on floor coverings requires an owner to ensure all floor space in the lot is covered or treated enough to prevent noise likely to disturb another lot, excluding the kitchen, laundry, lavatory and bathroom.

AAAC star ratings for impact sound. Lower dB is quieter and better. Most NSW strata by-laws require 4 star or better; stricter schemes require 5 or 6 star.
AAAC ratingImpact sound (L′nT,w)
2 Starbelow 65 dB
3 Starbelow 55 dB
4 Starbelow 50 dB
5 Starbelow 45 dB
6 Starbelow 40 dB

The approval pathway, in plain terms

Under section 110 of the Strata Schemes Management Act 2015 (NSW), removing carpet or other soft floor coverings to expose or install hard flooring is expressly prescribed as a minor renovation. That matters, because a minor renovation needs approval by ordinary resolution at a general meeting — not the special resolution and by-law that section 108 works require. Approval may be given subject to reasonable conditions, and it cannot be unreasonably withheld. Many schemes delegate the decision to the strata committee.

In practice this means a written application with the right attachments, and typically two to four weeks for a decision.

What schemes usually ask for

  • An acoustic test report from an accredited laboratory, or a desktop assessment by an acoustic engineer, showing the proposed system meets the by-law and at minimum the NCC figures.
  • The contractor’s public liability insurance certificate.
  • Workers compensation cover.
  • A quote or scope detailing the products and the areas involved.
  • Often a SWMS, agreed work hours, and a plan for protecting lifts and common areas.

The honest part nobody puts on their website

Underlay ratings are laboratory figures, measured on a specific test slab with a specific build-up. Your building is not that slab. Concrete thickness, the ceiling treatment in the lot below, service penetrations and cavities all change the real result, sometimes substantially.

So a product rated 6 star in a lab is not automatically 6 star in your apartment, and only on-site testing after installation confirms actual performance. We say this out loud because being surprised by it later is expensive — and because a contractor who promises a lab number as an installed guarantee is telling you something they cannot know.

What we do

We check your by-law before specifying anything, propose a floor build-up with documented acoustic performance, and put together the application pack so you can submit it. Then we work to the building’s access rules, protect the common areas, and keep to the permitted hours.

At a glance

NCC 2022 Part F7Impact L′nT,w ≤ 62 and airborne Rw + Ctr ≥ 50 between sole-occupancy units
Test methodAS ISO 717.2
Typical by-law requirementAAAC 4 star or better; stricter schemes require 5 or 6 star
Approvals110 minor renovation — ordinary resolution, not a special resolution
Typical timeframe2–4 weeks from submission to decision
Products usedFloating engineered oak or hybrid over rated acoustic underlay

Related work

From this kind of job

Engineered oak boards being laid in an apartment living room
Engineered oak going down in an apartmentApartment · engineered oak
Planks being laid over underlay, with the underlay visible between runs
Planks going down over underlay, laid run by runInstallation · in progress
Afternoon light across a completed timber-look floor in an open living room
Afternoon light across a finished floorTimber-look plank · completed
A bedroom floor completed in hybrid plank
A bedroom finished in hybrid plankHybrid · completed

Questions

Common questions

Do I need strata approval for timber flooring in NSW?

Yes. Removing carpet to install or expose hard flooring is prescribed as a minor renovation under section 110 of the Strata Schemes Management Act 2015, which requires approval by ordinary resolution at a general meeting. It does not require a special resolution or a new by-law. Approval can carry reasonable conditions but cannot be unreasonably withheld, and many schemes delegate the decision to the strata committee.

What acoustic rating do I need for apartment flooring in NSW?

At minimum, the NCC 2022 Part F7 figures: impact sound L′nT,w of 62 or less and airborne Rw + Ctr of 50 or more. Most strata by-laws set something stricter, usually expressed as an AAAC star rating of 4 star (below 50 dB) or better, with some buildings requiring 5 or 6 star. Check your specific by-law — it overrides the general assumption.

What does AAAC 5 star or 6 star actually mean?

They are impact sound ratings, measured as L′nT,w in decibels, where a lower number means less noise transmitted to the apartment below. 4 star is below 50 dB, 5 star is below 45 dB, and 6 star is below 40 dB. 6 star is achievable in most apartments with a high-performance acoustic underlay system, though the result always depends on the building as well as the underlay.

How long does strata approval take for flooring?

Typically two to four weeks from submitting a complete application. The main delay is usually the meeting cycle rather than the decision itself, since approval is by ordinary resolution at a general meeting, though many schemes delegate it to the strata committee which can be faster. Submitting a complete pack first time is the single biggest thing that speeds it up.

Can I install solid timber flooring in an apartment?

It is generally discouraged and often not permitted. Solid timber direct-fixed to a concrete slab transmits impact noise far more readily than a floating system, and it is difficult to meet a 5 or 6 star by-law with it. The practical solutions for apartments are floating engineered timber over a rated acoustic underlay, or hybrid flooring with an acoustic backing.

Will an acoustic underlay guarantee my floor passes?

No, and be cautious of anyone who says it will. Underlay ratings come from laboratory tests on a specific slab and build-up. Your building’s slab thickness, the ceiling treatment below, and any cavities or service penetrations all affect the real result. A lab figure is a strong indicator, not a guarantee — only on-site testing after installation confirms actual performance.

Also relevant

Related services

Engineered oak flooring

The most specified floor in Sydney right now, and for good reason — real timber wear layer, far more dimensional stability than solid, and it suits apartments.

Read more

Hybrid, SPC & vinyl plank

Waterproof, hard-wearing and quieter underfoot than laminate — the sensible answer for wet areas, rentals, holiday houses and anywhere with kids and dogs.

Read more

Floor sanding & polishing

Bringing tired, dark, scratched floorboards back to raw timber and finishing them properly — with dust extraction that keeps the rest of the house liveable.

Read more

Free measure & quote

Get a quote for apartment & strata flooring

Free on-site measure, itemised written quote, and the exclusions stated plainly.

Hours
Mon–Fri 7am–5pm · Sat 8am–2pm

What do you need?
Where, and how much?

Property type

Roughly how much floor?

When are you thinking?
How should we reach you?

We answer every enquiry within 2 business hours. No obligation, and no payment until you accept a written quote.

Call 0420 990 405 Free quote